Skip to content

Mobile plant SWMS for powered plant movement.

Record mobile plant hazards, exclusion zones, operator competency and site control measures.

Buy SWMS credits when you need them, or choose Unlimited for crews creating SWMS across multiple jobs and sites.

SWMS readiness

Details, required sign-off, send status and records.

New SWMS

Needs details

3

Site, supervisor or principal contractor fields missing

Waiting for sign-off

5

Required workers still need to review

Ready to send

2

Issued and signed, waiting for the PDF send

Sent

12

PDFs sent and kept with the SWMS record

Send failed

1

Needs another attempt

Updated after send

2

Changed records that need review

SWMS to check before work starts

Richmond warehouse conversion

Waiting for 2 required signers

Waiting for sign-off

Brunswick mixed-use project

Issued SWMS ready to send

Ready to send

Fitzroy health clinic rough-in

Sent to principal contractor

Sent

Carlton tenancy fit-off

PDF changed after send

Updated after send

Work covered

This page is for crews using powered mobile plant preparing SWMS for excavators, loaders, pumps, EWPs and other powered mobile plant.

Controls to document

Use SiteWise SWMS to capture plant movement, spotters, exclusion zones, inspections and competency in a consistent record.

Record outcome

The goal is a mobile plant SWMS record with clear responsibilities, with required worker sign-off and supporting evidence kept together.

Practical SWMS sections included

  • Site details: business, principal contractor, supervisor, work activity and review dates.
  • High-risk work: selected construction work categories carried into the record.
  • Risk controls: task steps, hazards, initial risk, control measures and residual risk.
  • Required sign-off: workers review the SWMS and confirm they understand the controls.
  • Send record: for Unlimited accounts, the PDF send status, recipient and PDF version are kept with the SWMS.

Build SWMS

Template, site details, required sign-off and PDF record.

Issue SWMS

Site-specific details

Electrical fit-off and maintenance
Brunswick mixed-use project
Northbank Constructions
Mia Harrington, supervisor

Required sign-off

Assign the workers who need to review the SWMS before the PDF goes out.

Ava SinghSigned
Daniel ChoOutstanding
Lachlan ReedOutstanding

Create a SWMS record ready for the site.

Start with templates, risk controls, required sign-off and the PDF ready to send.

Create your first SWMS