Skip to content

Working at heights SWMS for fall-risk work.

Document fall risks, access controls, exclusion zones, rescue considerations and worker sign-off.

Buy SWMS credits when you need them, or choose Unlimited for crews creating SWMS across multiple jobs and sites.

SWMS readiness

Details, required sign-off, send status and records.

New SWMS

Needs details

3

Site, supervisor or principal contractor fields missing

Waiting for sign-off

5

Required workers still need to review

Ready to send

2

Issued and signed, waiting for the PDF send

Sent

12

PDFs sent and kept with the SWMS record

Send failed

1

Needs another attempt

Updated after send

2

Changed records that need review

SWMS to check before work starts

Richmond warehouse conversion

Waiting for 2 required signers

Waiting for sign-off

Brunswick mixed-use project

Issued SWMS ready to send

Ready to send

Fitzroy health clinic rough-in

Sent to principal contractor

Sent

Carlton tenancy fit-off

PDF changed after send

Updated after send

Work covered

This page is for trade teams working above ground level preparing SWMS for work where a person could fall more than 2 metres.

Controls to document

Use SiteWise SWMS to capture edge protection, harness systems, ladders, platforms and weather checks in a consistent record.

Record outcome

The goal is a structured working at heights SWMS for site records, with required worker sign-off and supporting evidence kept together.

Practical SWMS sections included

  • Site details: business, principal contractor, supervisor, work activity and review dates.
  • High-risk work: selected construction work categories carried into the record.
  • Risk controls: task steps, hazards, initial risk, control measures and residual risk.
  • Required sign-off: workers review the SWMS and confirm they understand the controls.
  • Send record: for Unlimited accounts, the PDF send status, recipient and PDF version are kept with the SWMS.

Build SWMS

Template, site details, required sign-off and PDF record.

Issue SWMS

Site-specific details

Electrical fit-off and maintenance
Brunswick mixed-use project
Northbank Constructions
Mia Harrington, supervisor

Required sign-off

Assign the workers who need to review the SWMS before the PDF goes out.

Ava SinghSigned
Daniel ChoOutstanding
Lachlan ReedOutstanding

Create a SWMS record ready for the site.

Start with templates, risk controls, required sign-off and the PDF ready to send.

Create your first SWMS